EPSRC logo

Panel Name: ICT Prioritisation Panel (Feb 10)
Date of Panel: 02 February 2010
Panel Contact: Dr Matthew Ball

Panel Rank Ordered List: ICT Standard Research

RankGrant ReferencePrincipal InvestigatorHolding OrganisationGrant TitleValue (£)
1.
EP/H026835/1
Professor A DawarUniversity of CambridgeDescriptive Complexity with Algebraic Operators424,833
2.
EP/H037853/1
Professor M KuballUniversity of BristolDevelopment of an integrated optical E-Probe for GaN power transistor reliability analysis305,012
3.
EP/H030115/1
Dr NA DodgsonUniversity of CambridgeUnifying NURBS and subdivision: Extracting sparse shape descriptions using NURBS-compatible subdivision664,696
4.
EP/H042512/1
Professor Y GuoImperial College LondonElastic Sensor Networks: Towards Attention-Based Information Management in Large-Scale Sensor Networks471,777
5.
EP/H035745/1
Professor DP ShepherdUniversity of SouthamptonUltrafast Multi-GHz Waveguide Lasers449,071
5.
EP/H038035/1
Dr C BrownUniversity of St AndrewsUltrafast Multi-GHz Waveguide Lasers346,997
 
EP/H041249/1
  Financial Deferral  
6.
EP/H032665/1
  Financial Deferral  
6.
EP/H042601/1
  Financial Deferral  
7.
EP/H042555/1
  Not Funded  
8.
EP/H033068/1
  Not Funded  
8.
EP/H033599/1
  Not Funded  
9.
EP/H025871/1
  Not Funded  
10.
EP/H029958/1
  Not Funded  
11.
EP/H023534/1
  Not Funded  
12.
EP/H030816/1
  Not Funded  
12.
EP/H030956/1
  Not Funded  
13.
EP/H025936/1
  Not Funded  
13.
EP/H025960/1
  Not Funded  
13.
EP/H026738/1
  Not Funded  
14.
EP/H029893/1
  Not Funded  
15.
EP/H040773/1
  Not Funded  
15.
EP/H040935/1
  Not Funded  
16.
EP/H029354/1
  Not Funded  
17.
EP/H032800/1
  Not Funded  
18.
EP/H037187/1
  Not Funded  
19.
EP/H030905/1
  Not Funded  
20.
EP/H03398X/1
  Not Funded  
0.
EP/H029656/1
  Deferred For Additional Reviewers  

I accept these terms and conditions

Notes:

  1. To maintain the anonymity of applicants, full details are available only for those proposals that have been funded.
  2. The number shown is the rank assigned by the panel at the meeting.
  3. Where proposals have the same number, these are joint proposals that were considered as a single application.
  4. Proposals showing as 'Decision Awaited' are given a rank 'n/a' until the decision has been made, and then the final rank will appear.
Return to the main panel page