EPSRC logo


Panel Name: Engineering Prioritisation Panel Meeting 13 and 14 June 2018
Date of Panel: 13 June 2018
Panel Contact: Cooper, Nicholas

Panel Rank Ordered List:  d: Standard Grants

RankGrant ReferencePrincipal InvestigatorHolding OrganisationGrant TitleValue (£)
1.
EP/R037027/1
Timme, Dr SUniversity of LiverpoolExtending the buffet envelope: step change in data quantity and quality of analysis298,587
1.
EP/R037167/1
Sandham, Professor NDUniversity of SouthamptonExtending the buffet envelope: step change in data quantity and quality of analysis311,065
2.
EP/R044163/1
Varcoe, Professor JRUniversity of SurreyREDAEM: Anion-Exchange Membranes for Reverse Electrodialysis429,829
2.
EP/R044546/1
Ferrari, Professor MUniversity of EdinburghREDAEM: Anion-Exchange Membranes for Reverse Electrodialysis349,186
3.
EP/S003576/1
Merat, Professor NUniversity of LeedsHAROLD415,448
3.
EP/S004009/1
Fotios, Professor SAUniversity of SheffieldHAROLD: HAzards, ROad Lighting and Driving578,684
4.
EP/S000917/1
Azarpeyvand, Professor MUniversity of BristolJINA: Jet Installation Noise Abatement590,853
4.
EP/S002065/1
Karabasov, Professor SQueen Mary University of LondonJINA: Jet Installation Noise Abatement422,275
5.
EP/S00081X/1
Wang, Professor JUniversity of SheffieldInsulation degradation and lifetime of inverter-fed machines with fast switching (high dv/dt) converters1,199,232
6.
EP/R045240/1
Tyas, Professor AUniversity of SheffieldMechanisms and Characterisation of Explosions (MaCE)1,284,838
7.
EP/R044201/1
  Not Funded 
7.
EP/S000399/1
  Not Funded 
8.
EP/R043205/1
  Not Funded 
9.
EP/R044775/1
  Not Funded 
10.
EP/S000119/1
  Not Funded 
11.
EP/R044961/1
  Not Funded 
12.
EP/S00050X/1
  Not Funded 
12.
EP/S000968/1
  Not Funded 
13.
EP/S003134/1
  Not Funded 
13.
EP/S003371/1
  Not Funded 
13.
EP/S003541/1
  Not Funded 
13.
EP/S003568/1
  Not Funded 
13.
EP/S00372X/1
  Not Funded 
13.
EP/S003959/1
  Not Funded 
14.
EP/S002901/1
  Not Funded 
15.
EP/S003096/1
  Not Funded 
16.
EP/R041881/1
  Not Funded 
17.
EP/R045259/1
  Not Funded 
18.
EP/S000542/1
  Not Funded 
19.
EP/S002847/1
  Not Funded 
20.
EP/R044600/1
  Not Funded 
21.
EP/S000836/1
  Not Funded 
21.
EP/S00145X/1
  Not Funded 
22.
EP/S000801/1
  Not Funded 
22.
EP/S000844/1
  Not Funded 
22.
EP/S002189/1
  Not Funded 
23.
EP/S004122/1
  Not Funded 
24.
EP/S00355X/1
  Not Funded 
24.
EP/S004092/1
  Not Funded 
25.
EP/S001115/1
  Not Funded 
25.
EP/S00260X/1
  Not Funded 
26.
EP/S002758/1
  Not Funded 
27.
EP/R045119/1
  Not Funded 
28.
EP/R042616/1
  Not Funded 
29.
EP/S000704/1
  Not Funded 
30.
EP/R033056/1
  Not Funded 
31.
EP/S003630/1
  Not Funded 
31.
EP/S004815/1
  Not Funded 
32.
EP/S004475/1
  Not Funded 
32.
EP/S004483/1
  Not Funded 
33.
EP/S000194/1
  Not Funded 
33.
EP/S000313/1
  Not Funded 
34.
EP/S003932/1
  Not Funded 
34.
EP/S003983/1
  Not Funded 
35.
EP/S000860/1
  Not Funded 
36.
EP/S003355/1
  Not Funded 
37.
EP/R043086/1
  Not Funded 

Notes:

  1. To maintain the anonymity of applicants, full details are available only for those proposals that have been funded.
  2. The number shown is the rank assigned by the panel at the meeting.
  3. Where proposals have the same number, these are joint proposals that were considered as a single application.
  4. Proposals showing as 'Decision Awaited' are given a rank 'n/a' until the decision has been made, and then the final rank will appear.
Return to the main panel page